Project Overview

  • Project Location
    Hebei | Tangshan
    Project Type
    BIPV
  • Product Type
    LONGi Hi ROOF S
    Project Capacity
    879.78 kW
  • Grid Connection Time
    August 2025
    Full Lifecycle Carbon Reduction
    17,000 tons

Project Details

This project covers four key areas of the hotel: the Water World rooftop, the Sunroom, the office building roof, and the carport, achieving comprehensive integration of green electricity throughout the hotel’s operations.

The carport, equipped with the LONGi Hi ROOF S system, has been successfully transformed into a "Multi-functional Energy Station." The rooftop photovoltaic system continuously captures sunlight and converts it into electricity, working in tandem with energy storage charging piles to create a "generation-storage-charging" closed-loop.