LONGi Shandong Hengsheng New Materials 3.16MW Hi ROOF S Project

Cases image
Cases image
Cases image
Cases image

Project Overview

  • Project Location
    China | Shandong
    Project Type
    BIPV
  • Product Type
    LONGi Hi ROOF S
    Project Capacity
    3.16 MW
  • Full Lifecycle Carbon Reduction
    60,000 tons

Project Details

Addressing common issues in PV rooftop projects in windy northern regions—such as bolt loosening, water leakage, and maintenance difficulties—the project utilizes the LONGi Hi ROOF S system. Its linear seamless connection ensures wind resistance, while its integrated design fundamentally eliminates water leakage risks. This solution features fast installation, maintenance-free self-cleaning, and improved power generation efficiency.