LONGi GANI Marble Industrial Park 80MW BIPV Project

Cases image

Project Overview

  • Project Location
    china | Guangxi
    Project Type
    BIPV
  • Product Type
    LONGi ROOF
    Project Capacity
    80 MW
  • Full Lifecycle Carbon Reduction
    1.75 million tons

Project Highlights

In April 2024, an unusually strong storm suddenly hit the ceramic companies in the Ceramic Park.

Many buildings' roofing tiles and PV panels were blown down to the factory outside the hillside, on the road, while the LONGi ROOF system on the roof of the GANI factory was unharmed.

'No damage, no water leakage', as confirmed by the customer. The reliable performance of LONGi ROOF was praised after withstanding severe typhoons.