LONGi Thailand Super Ice 537.95kW C&I PV Project

Cases image
Cases image
Cases image
Cases image

Project Overview

  • Project Type
    Industrial and commercial projects
    Project Location
    Thailand | Bangkok
  • Application Scenario
    Rooftop
    Project Capacity
    537.95 kW
  • Product Type
    Hi-MO X10
    COD
    2025.05
Technical Highlights
Bangkok, Thailand, has abundant solar resources, naturally suitable for solar PV installation. Hi-MO X10, equipped with HPBC 2.0 cells, achieves a module efficiency of up to 24.8%, which will bring Super Ice ultra-high power generation revenue. Hi-MO X10 utilizes bipolar hybrid passivation technology and a built-in bypass diode-like structure, making the modules more resistant to UV radiation, have lower degradation, and be unafraid of shading. It employs LONGi's self-developed TaiRay wafers, which have higher purity and lower impurities. The first-year degradation is 1%, the linear degradation is 0.35%, and the temperature coefficient is -0.26%/°C. Additionally, their strength is increased by 16% compared to ordinary wafers, significantly improving Micro Crack Risk resistance.

Project Highlights

Super Ice is a professional ice-making company headquartered in Bangkok. Its refrigeration systems require continuous consumption of large amounts of electricity for heat removal and ice formation, leading to high electricity costs, especially significant during summer. To improve the current situation, they decided to build a solar PV power station.


The completion of this Hi-MO X10 power station has delivered direct economic results for Super Ice—helping the enterprise reduce its monthly electricity costs by approximately 200,000 THB, while also supporting its transition onto a green development path.