Tangshan Wancen New Energy Technology Co., Ltd. primarily sells new energy vehicle battery swap facilities and smart power transmission, distribution, and control equipment. The electric heavy-duty truck charging station it operates faces high industrial electricity costs. Seeking to reduce core operational costs and deeply align with Tangshan's strong policy direction promoting the green transformation of the steel industry, the company aimed to build a PV power station.
The owner installed 5.7 MW of Hi-MO X10 PV modules on a 35,000 m² roof. The annual power generation is 6.84 million kWh, supplying not only the enterprise's factory operations but also directly providing green electricity to the electric heavy-duty truck charging station. It saves ¥5,000,000 CNY (approx. $703,235 USD) in electricity costs annually, building multiple advantages in economic benefits, policy alignment, and long-term competitiveness.