LONGi Shanghai Chunhui Cooling 800kW Commercial PV Project

Cases image
Cases image
Cases image
Cases image
Cases image

Project Overview

  • Project Type
    Commercial PV Project
    Project Location
    China | Shanghai
  • Project Capacity
    800kW
    Product Type
    Hi-MO X10
  • COD
    2025.03
    Partner
    Chunhui Cooling&Shanghai Dienai New Energy Co., Ltd
Technical Highlights
The Hi-MO X10 modules, with their 670W power output, outperform mainstream photovoltaic modules of the same form factor by 40W, allowing for a 6% increase in installation capacity within the same area. Many manufacturing enterprises in Shanghai, located in suburban industrial parks, face challenges such as partial shading of solar power stations caused by surrounding high-rise buildings, trees, or bird droppings. The Hi-MO X10 modules, equipped with a unique pseudo-bypass diode structure, reduce shading losses by 70% compared to TOPCon modules under partial shading conditions. Moreover, the industrial park where Chunhui Refrigeration is located has a high concentration of industrial clusters, which necessitates stringent fire safety requirements. The Hi-MO X10 modules significantly reduce the surface hot-spot temperature of the modules under shaded conditions, preventing localized overheating and minimizing fire hazards, thereby ensuring the stable operation of the modules and the safety of the roof.

Project Highlights

Chunhui Refrigeration Equipment Co., Ltd., located in Shanghai, is a leading manufacturer of ice cream filling machines. Recently, the company has integrated its ice cream production line with solar power through an 800kW distributed photovoltaic (PV) power station. The project investor, Shanghai Dienai New Energy Co., Ltd, conducted multiple rounds of evaluation on the market's PV modules and ultimately selected the Hi-MO X10 modules.

The PV power station operates on a "self-generation for self-use, with surplus power fed into the grid" model. Thanks to the high efficiency of the Hi-MO X10 modules, the station generates 956,000 kWh of electricity annually, saving RMB 912,500 in electricity costs and reducing CO₂ emissions by 700 tons per year.

Chunhui Refrigeration's industrial park is densely populated with industrial clusters, which necessitates high fire safety standards. The Hi-MO X10 modules significantly reduce the surface hot-spot temperature of the modules under shaded conditions, preventing localized overheating and minimizing fire hazards. This ensures the stable operation of the modules and the safety of the roof. As more and more power stations are connected to the grid, the HPBC 2.0 modules are gaining popularity on industrial and residential rooftops in Shanghai and around the world, earning the favor of more investors.